H.P. Power Transmission Corporation Ltd. Shimla came into existence on 27th August, 2008 as a part of unbundling of erst while HPSEB and was conferred the status of State Transmission Utility in the year 2010.

It has been entrusted the work of formulation/updating and Execution of Transmission Master Plan of the State for strengthening of Transmission Network and Evacuation of Power from upcoming HEPs.

Power System Master Plan for H.P. was finalized in the year 2011. Govt. of India has allocated $ 350 Million MFF of ADB loan for implementation of Power system master plan in a time bound manner. This loan shall fund construction of about 456 circuit Kms of transmission lines along with 13 sub stations of 2284 MVA capacity with 66 kV and above voltage level.

In addition, work on 6 sub stations and 200 circuit Km of transmission lines is planned to be taken up with funds amounting to Rs. 746 Crore approved under Green Energy Corridor Scheme of Govt. of India with financing as 40% loan from KfW bank , 40% NCEF Grant and 20% equity.

HPPTCL is committed to add up about 780 circuit Kms and 3500 MVA capacity to state transmission network by the year 2020. This infrastructure shall facilitate evacuation of about 3500 MW power from various remotely located HEPs upto Key load centers and CTU injection Points.


 







 


 

 

 


News

  • Corrigendum for Preliminary and Detailed Survey of 132 kV D/C Transmission Line by LILOing of existing 132kV S/C Giri-Kulhal Transmission Line from Tower no. 66 to 132/33/11 kV Substation at Gondpur Ponta Sahib in Distt. Sirmour

  • Corrigendum for tender no."GMP/4/2019"(Package-I-Shimla Zone,Package-II-Chamba Zone,Package-III-Kullu Zone)for "Maintenance of Transmission Lines under HPPTCL"

  • Corrigendum for Designing/Upgradation of HP Power Transmission Corporation Ltd. website with Three(3) years of Operation and Maintenance

  • NIT for Preliminary/Walkover and detailed Survey of 132kV D/C Transmission Line by LILOing of existing 132kV S/C GIRI-GAURA Transmission Line(CKT-II) from Tower No. 78 to proposed 132/33kV Substation at Charana in Distt. Sirmour

  • Invitation for bids for providing Sub Surface Stabilization works(left out) at 220/66/22kV GIS Sub-Station Bhoktoo under HPPTCL, PIU Bhabanagar, Distt. Kinnaur(H.P.)

  • Invitation for bids for Design, Engineering, Manufacture, Fabrication, Testing at Manufacturers Works, Transportation to Site, Insurance, Loading and Unloading, Storage, Erection, Testing and Commissioning of LILO of 132kV, DIC Transmission Line Kurthala -Bathri at proposed 33/132/220kV GIS Sub-Station Mazra at Pukhari in Distt. Chamba of Himachal Pradesh on Turnkey Basis

  • IFB for Designing/Upgradation of HP Power Transmission Corporation Ltd. website with Three(3) years of Operation and Maintenance
  • Scope of Work and Pre-Qualifying Criteria

  • Notice Inviting Tender for Preliminary and Detailed Survey of 132kV D/C Transmission Line by LILOing of existing 132kV S/C Giri-Kulhal Transmission Line from Tower No.66 to 132/33/11kV Substation at Gondpur Paonta Sahib in Distt. Sirmour

  • Notice Inviting Tender for GMP/4/2019 Maintenance of Transmission Lines under HPPTCL

  • Advertisement for availing services of Retd.officers of the Rank of Sr.Managers (E-6) and above levels on last pay drawn (-) Pension/EPF basis in HPPTCL initially for a period of one year.

  • Corrigendum for Advertisement for availing services of Retd.officers of the Rank of Sr.Managers (E-6) and above levels.

  • Contact Us

    Address

    Corporate Office

    Himfed Bhawan,
    Panjari (Below Old MLA Quarters) Shimla-05

    Telephone No.:0177-2831283/2830285

    Fax:0177-2831284

     

    Email:directorpc@hpptcl.in directorprojects@hpptcl.in

    CIN:U40101HP2008SGC030950


    visitor counters
    Hit Counter